Here we removed an existing retaining wall and rebuilt with a solid base. Once the wall was rebuilt, we put heavy duty membrane filter fabric behind it and added 1 1/2 stone for drainage and frost movement. We then added membrane filter fabric to the top of the stone and 3/4 processed gravel to finish the grade for future hot top.

BEFORE

AFTER

BEFORE

AFTER

AFTER

AFTER